Home Improvement

This August will be three years since we moved into our fixer upper.  We started off like gang-busters as soon as we closed on the house. We immediately changed the floors downstairs, updated the kitchen and renovated the half bath.

DSCN3176_1024
PRE: blonde, thin plank floors
P1000793_1024
POST: hickory, wide plank

 

DSCN3182_1024
PRE: eat-in kitchen, wood flooring
DSCN3265_1024
POST: eat-in kitchen, tiled

 

DSCN3271_1024
PRE: Master shower
AFTER: Master shower
POST: Master shower

 

BEFORE: Master shower floor
PRE: Master shower floor
AFTER: Master shower floor
POST: Master shower floor

 

DSCN3270_1024
PRE: Garden tub
P1000755_1024
POST: Garden tub

 

BEFORE: Kitchen
PRE: Kitchen
P1000778_1024
POST: Kitchen

 

BEFORE: Half bath
PRE: Half Bath
P1020226_1024
POST: Half Bath